1、電蒸汽鍋爐http://www.akcaya.com/及其輔機(jī)、水處理設(shè)備等的安裝應(yīng)符合設(shè)備制造廠的技術(shù)要求,設(shè)備基礎(chǔ)必須待設(shè)備到貨并與設(shè)計(jì)圖紙核對(duì)無(wú)誤后,方可施工。
Installation of electric steam boilers and auxiliary equipment, water treatment equipment, etc. shall comply with the technical requirements of equipment manufacturers, equipment foundation must be after the arrival of equipment and design drawings and check and correct, before construction.
2、電蒸汽鍋爐管道最高點(diǎn)放氣、最低點(diǎn)放水。
Electric steam boiler tubes deflate the highest point, the lowest point of water.
3、電蒸汽鍋爐管道安裝后的試壓驗(yàn)收,按《工業(yè)金屬管道工程施工及驗(yàn)收規(guī)范》進(jìn)行。
Pressure test after acceptance electric steam boiler pipe installation, according to the "industrial metal pipeline construction and acceptance of" conduct.
4、電蒸汽鍋爐http://www.akcaya.com/鍋爐房?jī)?nèi)所有用電設(shè)備及蓄熱裝置等都應(yīng)可靠接地。
Should be grounded electric steam boilers and boiler room all electrical equipment thermal storage devices.